Quality Control

Brickwork Movement Joints: Coordinate the Detail Before Laying

/ Ali Eskandari

A brickwork movement joint can look like a thin line on an elevation. On site, it is a detail shared by the architect, structural engineer, bricklayer, sealant installer and finishing trades. Agreeing its position is only the start: the completed assembly must retain the movement the design intends to accommodate.

Close-up of a vertical gap with dark backing between red brick wall panels and masking tape along both sides.

Think Brick Australia’s control-joints explanation, dated 13 December 2021, identifies foundation movement, brick expansion, temperature changes and shrinkage as sources of movement within masonry or between masonry and other building elements. A joint’s purpose therefore needs to be established from the project details. The same visual line does not mean every joint has the same job.

Start with the movement the detail addresses

CCAA’s Articulated Walling, Technical Note 61 explains articulation as dividing masonry into panels that can accommodate footing-induced distortion. Its August 2008 edition distinguishes that function from other movement-control purposes, while recognising that one joint can serve more than one function. This older guidance is useful for the underlying principle; its historic code references and spacing tables should not be treated as a current project specification.

For an Australian project, establish the approved design, masonry system and applicable approval requirements before work starts. Ask the designer to resolve the joint layout with openings, corners and supporting elements. A builder should not relocate a joint simply to hide it behind a downpipe or make the elevation more symmetrical. Record the accepted detail and issue it to every trade whose work meets the joint.

Connect architectural intent with construction

Consider a hypothetical community building with a long brick elevation and a glazed entrance. The architect wants a quiet vertical line beside the glazing; the structure and masonry details need to explain how that line works at the opening. Review the lintel arrangement, the frame junction and any required ties or restraint together. CCAA specifically notes that a joint beside an opening can change assumptions about masonry arching over a lintel.

A coordinated elevation is useful, but so is a section through the junction. Put the location, interfaces and visible finish in one agreed detail before the bricklayer reaches the opening. This lets the team settle the appearance while work remains accessible. It also gives procurement a defined sealant and backing arrangement to price, and gives the site team a clear inspection stage in the programme.

Keep the intended separation through the finishes

A neat surface bead cannot establish whether the joint behind it is functional. CCAA calls for articulation joints to remain free of mortar that would restrict closing. Its guidance also carries joints through rendered finishes; a groove in continuous render does not provide the same separation. Check the actual wall build-up and approved detail before finishing conceals the joint.

This is a useful point for an inspection record: identify the wall and joint, photograph its accessible condition and record any agreed correction before sealing. A photograph should show where it was taken and what stage it represents. A close-up without a location or drawing reference is harder for the next trade to interpret.

Read the sealant data as a complete system

Sealant selection involves more than colour. As one Australian-market example, Sika’s Sikaflex Construction AP+ data sheet, August 2025, version 01.01 declares movement capability of ±25% under ASTM C719. The document also specifies joint geometry, backing material, substrate preparation and priming. That declared capability depends on a suitably designed and installed joint; it is not permission to substitute the product into any gap.

The same data sheet calls for clean, sound, dry bonding surfaces and compatibility checks for coatings. It notes that a non-flexible paint film can crack over an elastic sealant. Coordinate the actual brick, adjacent materials, exposure and finish with the selected manufacturer’s current instructions. Where the assembly has other required performance, obtain the appropriate system detail rather than assuming a weather seal provides it.

A short check before the work is concealed

  • Confirm the latest joint layout, detail revision and designer’s accepted responses.
  • Match the installed location and interfaces to that detail, including the opening and support arrangement.
  • Inspect and record the accessible separation before backing and sealant conceal it.
  • Check the approved sealant, backing, preparation requirements and adjoining finishes.
  • Give the following trade the joint locations and details it must preserve.
  • Retain labelled photographs, product records and inspection acceptance in the handover file.

Handover should leave the building manager able to find the joints and identify the installed sealing system. Record agreed inspection and maintenance information with the product details. Future repainting or refurbishment can then be planned around the intended movement rather than treating every visible line as an ordinary mortar joint.

Sources and photograph

Sources checked 22 November 2026. The scenario is illustrative; joint design and acceptance remain project-specific.

Join the discussion

No sign-in required. Your email address will not be published. Comments may be held for moderation.