Downer EDI Limited is headquartered in North Ryde, Sydney, and listed on the Australian and New Zealand stock exchanges. Its Transport, Energy & Utilities and Facilities segments span construction, manufacturing and ongoing asset services in both countries. The financial figures cover the consolidated group and are in Australian dollars. Downer head office. Group overview.
Higher earnings on a smaller revenue base
For the year ended 30 June 2026, statutory revenue and other income fell 7.5% to A$9.745 billion. Consolidated statutory profit after tax rose from A$149.1 million to A$225.4 million, including non-controlling interests. Profit attributable to owners of the parent was A$216.5 million. Downer’s underlying EBITA, a management measure of earnings before interest, tax and acquired intangible amortisation, rose 6.1% to A$502.9 million. Its underlying margin increased from 4.4% to 5.1%. FY26 results release, 20 August 2026. Appendix 4E.
Downer attributed the increase in its comparable operating earnings to factors including progress on Queensland’s train programme, a steadier second half for Australian road services and improved delivery in energy and utilities. Management cited changes in the business mix and currency translation in explaining lower pro forma revenue. At 30 June, reported net debt to underlying EBITDA was 0.8 times, compared with 0.9 times a year earlier. Downer reported A$229 million of free cash flow. The year’s reported profit, adjusted earnings and cash flow each describe a different aspect of performance. FY26 Annual Report. FY26 results release.
Work in hand rose from A$35.1 billion to A$38.5 billion at year end, with A$12.2 billion of new work secured during FY26. Downer describes about 93% of the closing total as services work and about 90% as government-related. The A$38.5 billion covers work across multiple years. Facilities work in hand grew 20.2%, Energy & Utilities 11.5% and Transport 0.6%. The segment figures show where the pipeline expanded, and the services share shows how much of the order book is tied to service contracts. FY26 Annual Report, operating and financial review.
Road surfacing, recycled materials and motorway support
Downer offers pavement and mix design, asphalt manufacture and placement, resealing and full-depth reconstruction. Fixed and mobile plants serve road authorities, councils and other infrastructure owners. Its product and laboratory information describes accredited testing across asphalt, aggregates and other civil materials. For a resurfacing job, this brings the nominated mix, production source, placement and acceptance testing into the same procurement discussion. Road surfacing services. Asphalt products and laboratories.
Downer describes Reconophalt as a family of asphalt mixes that can incorporate reclaimed asphalt and other recovered materials such as glass or tyre rubber. It publishes an environmental product declaration and product sheets. Reconobase serves a different pavement layer. The July 2025 sheet describes a nominal 20 mm recycled granular pavement product made from reclaimed granular and asphalt material, supplied from Wingfield in South Australia. Downer documents its South Australian Class 2 PM 2/20RG registration and compliance testing to the nominated specification. Applications listed include road shoulders, hardstands and intermediate pavement layers. The distinction matters when a design calls for a bound asphalt surface or a graded granular layer. Reconophalt product information. Reconobase technical sheet, July 2025 revision.
Transurban appointed Downer to provide incident response and maintenance for NorthConnex, Hills M2 and the Lane Cove Tunnel. The initial seven-year term started in July 2026. Downer’s annual report values that term at about A$240 million, with extension options reported separately. The scope combines civil maintenance with work on mechanical and electrical assets, including tunnel ventilation and fire systems. That breadth matters on a motorway where pavement, equipment and incident response have to operate together. Downer exchange release, 4 June 2026. Transurban’s appointment, 25 June 2026.
Sydney fleet maintenance and Queensland train delivery
Downer’s Sydney Waratah work combines rollingstock supply with long-term maintenance under arrangements involving Reliance Rail and Transport for NSW. The company counts 119 eight-car trains across the two Waratah series. It identifies the Auburn Maintenance Centre for fleet servicing and Cardiff for heavy maintenance. Downer says its TrainDNA platform uses condition data from the trains to help maintenance teams plan interventions. Downer’s Waratah programme overview. Waratah fleet profile.

Queensland awarded Downer the design, build and maintain contract for its 65 six-car train programme in June 2023. The state reported manufacturing underway at Torbanlea on 17 June 2026. The programme includes a separate maintenance and stabling facility at Ormeau. WSP identifies John Holland and DT Infrastructure as the design and construct contractors for Torbanlea and Ormeau respectively. The manufacturing milestone marks a change in the work being performed, while the broader programme continues. Queensland Transport and Main Roads programme. Queensland’s 17 June 2026 announcement. WSP’s project and contractor record.
A newer example of recurring property maintenance
In November 2026, Downer announced a Homes Victoria contract for responsive and planned maintenance, vacant property restoration and upgrades in the department’s East Division. The initial five-year term is due to start on 1 February 2027. Downer estimates about A$400 million for the base scope across the potential nine-year term, including extensions. The award came after the FY26 reporting date. Together with the motorway and rail examples, it shows how the group’s service contracts involve maintaining assets over years as well as delivering physical works. ASX release, 2 November 2026. Capital Brief’s coverage, 2 November 2026.
References
Financial reporting for the year ended 30 June 2026. Downer FY26 Annual Report, results release and Appendix 4E, released 20 August 2026.
Australian contract and product records. Transurban, 25 June 2026. Queensland Government, 17 June 2026. Downer’s Homes Victoria announcement, 2 November 2026. Reconobase technical sheet, July 2025 revision. Downer’s logo identifies the company. The Waratah photograph is credited in its caption.




